Inable to create a 3rd party order for a network order/PS Project

Hi, 

1. I have created a project with CJ20N.

2. Then I have created a network order and attached it to the project created in step 1. Network order and project are released. 

3. Then on a PS activity of the same network. I have added a material not maintained in stock with a third party order with reservation/Purc. req put to Immediately. 

When saving evry thing, the system removes the material from the material list.

3rd party order on the network order.jpg

Thank you in advance for your help. 