1. I have created a project with CJ20N.
2. Then I have created a network order and attached it to the project created in step 1. Network order and project are released.
3. Then on a PS activity of the same network. I have added a material not maintained in stock with a third party order with reservation/Purc. req put to Immediately.
When saving evry thing, the system removes the material from the material list.
Thank you in advance for your help.